Lower Kaifu Gorge, Zambia 2HLS320-2S4500L+HLS240-2S3000L hydraulic pre-cooling mixing building
Two HLS320-2S4500L and one HLS240-2S3000L hydraulic precooling type mixing building (Before 2021, the domestic export of large-scale forced mixing equipment, our company has supplied hydropower Bureau 7 Pakistan Basha power Station for the domestic export of large-scale mixing equipment, A total of four HLS360-2S6000L mixing buildings and two HLS320-2S4500L mixing buildings)
Belt and Road key projects: "Pakistan's Three Gorges Dam" Basha hydropower project three and water engineering won all concrete mixing equipment
The project consists of four HL360-2S7000 and two HL320-2S4500 pre-cooled concrete mixing buildings.
The total amount of concrete poured was 18.7 million square meters, including 17.1 million square meters of pre-cooled RCC, and the pouring period was 6 years.
Upon completion, it will become the world's largest pre-cooled concrete production system.
Recently Viewed:
Online evaluation (0)
- menu
-
ABOUT
-
PRODUCT
-
NEWS
-
CASE
-
MESSAGE
CONTACT
-
Tel:
0371-60257862
-
Fax:
0371-60257822
-
Web:
www.sanheshuigong.com
-
Add:
Address: Huaixi Industrial Park, Zhongyuan West Road, Zhengzhou City
Jiaozuo Factory: Southeast corner of Heshuo Avenue and Xingye Road, Wuzhi industrial Cluster Area, Jiaozuo City
Technical Support: Huaqi Xiangyun Disclaimers
No evaluation information!