How to treat the cleaning sewage of concrete mixing station?
Soil mixing plant is also very important for water control, which is also an aspect of production cost control. Washing mixers and cement tankers every day uses a lot of water. It is difficult to handle concrete after it has set. Therefore, the cleaning process during shutdown is a very troublesome project.
Moreover, the washing water of these washing equipment contains a mixture of impurities carried by cement slurry, aggregate and aggregate. From the point of view of environmental protection, the cleaning water of cement mortar or concrete is strongly reducing, the PH value is high, up to about 12, and random emissions will pollute the environment. The reason for the headache is that in recent years, with the continuous improvement of environmental protection requirements, the wastewater treatment of concrete mixing station has become the main concern.
In fact, washing cars with clean water is also a big waste. If no transport vehicles are washed with 1-2 tons of water, 2-3 times a day, the medium mixing station uses 20 vehicles a day, for example, using 40-120T of water a day, from this point of view, the reuse of washing water is very conducive to environmental protection and water conservation.
What do you need to check before using a mixing plant?
1. Check the storage system
Check the sand and stone storage hopper and any bucket for damage, if any, remove debris, should check the water in the storage tank for leakage, water supply strip and pump operation, as well as the water pump for a long time without water, the same is true of the admixture tank.
2. Check the tank
Check the oil level of the tank of the mixing plant and the level of the crankcase of the air compressor, and add the compressor oil when the pressure is insufficient.
3. Check the conveyor system
Check that the belt conveyor belt is not aligned and adjust the deflected belt. Check the steering of the belt conveyor, whether the sound is normal, and whether the motor housing is damaged.
Check that the screw conveyor is turning correctly. What needs to be checked? Motor sound is normal, motor shell is there debris. Check the tightness of the V-belt. If it is too loose, adjust it correctly.
Engineering station
Recently Viewed:
- menu
-
ABOUT
-
PRODUCT
-
NEWS
-
CASE
-
MESSAGE
CONTACT
-
Tel:
0371-60257862
-
Fax:
0371-60257822
-
Web:
www.sanheshuigong.com
-
Add:
Address: Huaixi Industrial Park, Zhongyuan West Road, Zhengzhou City
Jiaozuo Factory: Southeast corner of Heshuo Avenue and Xingye Road, Wuzhi industrial Cluster Area, Jiaozuo City
Technical Support: Huaqi Xiangyun Disclaimers